The Power of a Well-Planned Project
15 minutes ago
3 min read
0
2
0
Large-scale projects like roofing, painting, paving, or structural repairs can significantly improve a community, but they also have the potential to create stress, unexpected costs, and disruptions if they are not managed well. The difference between a smooth experience and a difficult one usually comes down to planning.
A well-planned project gives the board, the manager, vendors, and homeowners a clear roadmap. It establishes expectations from the outset and minimizes the chance of unpleasant surprises along the way. The following steps outline both why each part of the planning process matters and how to put it into practice.
1. Define the Scope Clearly and Early
When the scope of a project is vague, contractors bid on different assumptions, costs spiral, and work often needs to be redone. A well-defined scope allows for accurate bids, clear comparison between vendors, and fewer misunderstandings during the work itself.
Begin by assessing the need early through reserve studies, maintenance records, or professional inspections. Document the scope in writing with specific details about locations, materials, finishes, and access considerations. Include photos or diagrams where helpful. Once the scope is clear, have the board formally approve it before seeking bids to avoid shifting expectations mid-process.
2. Budget Realistically and Align Funding in Advance
Financial strain is one of the most common pitfalls in HOA projects. When a project is underfunded, boards often face difficult mid-year assessments, deferred work, or drawn-out timelines.
Start the budgeting process well in advance—ideally six to twelve months before the project begins. Obtain estimates early and include a contingency amount, usually 10 to 15 percent, to cover unforeseen issues. Confirm whether funds will come from reserves, a special assessment, insurance proceeds, or another source. Aligning funding before contracts are signed ensures the project can proceed without interruption.
3. Establish a Realistic Timeline
Rushed or poorly sequenced timelines frustrate homeowners and vendors, and they increase the likelihood of costly delays. By setting a realistic timeline, the board can ensure that work occurs in the right order and at the right pace.
Work backward from the desired completion date, building in time for bidding, contract review, board approvals, permitting, and communication. Consider seasonal factors and vendor availability. Adding buffer time for weather or unexpected discoveries prevents last-minute scrambling.
4. Communicate Early and Consistently
Even well-planned projects can create inconvenience for homeowners. Proactive communication builds trust and cooperation, which ultimately makes the project run more smoothly.
Develop a communication plan that includes initial notices, reminder notices, on-site signage, and timely updates if timelines shift. Use multiple channels such as email, portals, and physical postings so information reaches everyone. Identify a single point of contact for homeowner questions to prevent confusion and ensure clear, consistent messaging.
5. Coordinate with Vendors Thoroughly
When expectations are unclear, vendors are forced to make assumptions, which often leads to delays or additional costs. Thorough coordination supports efficiency and accountability.
Provide contractors with clear access information and staging plans. Hold a pre-construction meeting to review logistics, timelines, and communication protocols. Document key points, including how change orders will be handled. Monitor progress regularly so issues can be addressed before they grow.
6. Protect the Association Legally and Financially
Major projects involve legal and financial exposure that can be mitigated through proper planning. Without clear contracts, insurance verification, and lien protections, the association risks disputes or financial liability long after the work is complete.
Use written contracts that spell out scope, timelines, payment schedules, and change order procedures. Verify insurance and licensing before work begins. Require lien releases with each payment. Document all board decisions related to vendor selection and funding.
7. Document the Process for the Future
The benefits of good planning extend beyond the current board’s term. Thorough records help future boards understand what was done, how it was funded, and what warranties or obligations remain.
Complete a final walkthrough with the contractor, close out punch list items, and collect all warranties and lien releases. Store contracts, communications, and schedules in the association’s permanent records. Take note of what worked well and what should be improved for next time.
Well-planned projects save money, reduce conflict, and improve the overall experience for everyone involved. They ensure that work is done correctly the first time, funding is secured, and communication is clear. Just as importantly, they build trust within the community and lay a foundation of good governance for future boards.
The effort invested in planning is often the difference between a project that simply gets done and one that strengthens the community for years to come.